Skip to content
hello@robotexportdenmark.com
RobotExportDenmark

Buyer guides

How to source industrial robots from Denmark: a step-by-step guide

By Robot Export teamPublished 2 min read

Why buyers look at Denmark

For the latest public statistics and context on Denmark's manufacturing and robotics market, see the market page on this site; we only publish figures we can source.

This guide walks through the sourcing process step by step, whether you need a single welding cell, a fleet of mobile robots or a complete production line from Denmark.

Step 1: Write the brief before you look for suppliers

Supplier proposals are only as good as the brief. Describe the process, not the robot you think you need.

  • Application: welding, palletizing, machine tending, assembly, inspection or intralogistics
  • Part or load: drawings, weight, dimensions, material and variants
  • Throughput: target cycle time, shifts and expected uptime
  • Site: floor space, utilities and the machines the cell must connect to
  • Destination country, compliance marks required and who installs
  • Budget range and target delivery date

Step 2: Decide whether you need a robot, a cell or a line

Some suppliers in Denmark build robots; many more are integrators who design cells around robot brands from several countries. Decide where your scope boundary sits. If you have your own integration team, you may only need equipment. If you want a working system in your plant, you need an integrator who takes responsibility for the whole cell, including fixtures, safety and controls.

Step 3: Build a shortlist of three to five suppliers

Screen for demonstrated experience with your application, not general capability statements. Ask for comparable references, the share of work that is exported and the destination markets they have delivered to. Confirm the workshop address and what is done in-house.

Step 4: Ask for proof that the application runs

Ask to see your parts, or close analogues, run on video or at the workshop. Agree in writing what success looks like at the factory acceptance test and at the site acceptance test.

Step 5: Lock compliance, language and service

Say where the cell will be installed and which marks you need (CE or the EU Machinery Regulation in Europe, UL/CSA/NRTL in North America). Agree who writes the risk assessment, the manuals language, training, spare parts and who attends a stoppage.

Step 6: Price the landed cell, not just the arm

Ask for a breakdown that separates the robot, tooling, safety, controls, software, installation, training, freight, insurance, duties and taxes. Name the Incoterms 2020 rule you want and who buys insurance.

Step 7: Share a brief

If you want help building a shortlist in Denmark, send a short brief through this site. We will come back with next steps. This is not a substitute for your own technical due diligence.

Sources

  1. International Chamber of Commerce — Incoterms 2020
  2. European Commission — Machinery Regulation
  3. Robot Export hub

Ready to start? Share your brief

Every sourcing project starts with a short brief: your application, volumes, destination and timeline. Send it and we'll come back with next steps.

Share your brief